.

Madison In The Midst of Road Upgrades

Road repaving will continue until the fall.

File image
File image

The Department of Public Works began the first phase of road work in late May and this work will take place over a period of several months and is anticipated to be complete prior to the start of school in the Fall of 2014.

The work will include the full depth restoration and resurfacing of the following roads:

  • Bower Road
  • Hathaway Lane
  • Madrina Lane
  • Old Duck Hole Road
  • Pine Ridge Drive
  • Skytop Drive
  • Tamarac Drive

In addition, the section of Opening Hill Road between Manzoni Farms Road and Carmel Court will be milled and resurfaced.

One lane of alternating traffic will be maintained at all times in work zones.

Motorists, cyclists and pedestrians are advised to exercise caution when approaching and traveling through work zones.

Please contact the Department of Public Works at 203-245-5611 for additional information.

Austin June 21, 2014 at 10:37 AM
A smart town would install sidewalks on these new roads and in front of Hand which should have been done years ago
Judy Eide June 24, 2014 at 12:47 PM
Wondering when the road repair will be done on FT Path-right in front of the DPW for about 150 yards in either direction. The piecemeal patchwork isn't going to last. Please consider this for the next round of milling and repaving. You can see the three layers of pavement are in dire need of fixing, not just patching with left over material.

Boards

More »
Got a question? Something on your mind? Talk to your community, directly.
Note Article
Just a short thought to get the word out quickly about anything in your neighborhood.
Share something with your neighbors.What's on your mind?What's on your mind?Make an announcement, speak your mind, or sell somethingPost something
See more »